Salisbury Quarry Homeowner's Association, Inc.
Home arrow Quarry Rights & Policies
 
Quarry Rights & Policies PDF Print E-mail

THE QUARRY ASSOCIATION'S RIGHTS ARCHITECTURAL COMMITTEE 

GENERAL ITEMS 

  1. Plans and specifications for all dwellings, buildings, landscaping and other improvements and structures to be constructed and/or situated within the subdivision shall be submitted by the builder for examination and approval by the Architectural Committee. Two sets of blueprints must be submitted. One may be retained by the AC.
  2. Set backs on lots – Front – 35’, Side Yards – 10’, Rear – 25’.
  3. Dirt grade at building determined by Lucas County and stated on Architectural Committee approval. Refer to Deed Restriction 2.8.
  4. No tree greater than six inches shall be removed for construction without approval.
  5. On all lots 100 feet or wider at the building line garages must be side loading or rear loading. On any lot less than 100 feet in width, (at the building line) the Association reserves the right to require a courtyard side-load garage.
  6. Outbuildings of any kind are prohibited, with the exception of. This includes storage sheds of any kind.
  7. Lots 267-276 may include a detached, private garage of not more than two car capacity of no more than twenty-two feet wide by twenty-four feet deep.
  8. Architecturaldetails on all four elevations. Windows required on side elevations.
  9. Front elevations will be brick veneer. Brick skirt on rear and side elevations is not required.
  10. Address stone with house number shall be placed in front elevation masonry.
  11. Horizontal siding will be pre-approved vinyl siding. No vinyl siding will be permitted on front elevations. Vinyl siding colors are also pre-approved.
  12. Outside trim, including soffits, fascia and rakes on front elevation will be wood. Side and rear outside trim may be vinyl.
  13. Colors of roof, brick, siding and outside trim shall be submitted for approval prior to application.
  14. A landscape plan including any retaining walls or fences must be submitted to the AC.
  15. Landscape irrigation is required in front yard. Side and rear yard irrigation is optional.
  16. City sidewalk information is available from the recorded plat.
  17. Mailboxes will be uniform in design, color and size. The location to be determined by the U.S. Postmaster.
  18. Street trees required by the Association are Red Sunset Maple trees of one and one-half to two inches minimum diameter planted between the street pavement and right of-way line on both sides of the street with spacing of 35 to 50 feet. Center between back of curb and the front edge of sidewalk.
  19. Residences shall be completed within one year following the commencement of construction.
  20. During construction on a particular lot and prior to occupation of any residence, not more than two signs may be placed on any lot advertising the sale and company constructing the residence. All signs shall be located at least fifteen feet back from the right-of-way line.
  21. Building materials not incorporated into said structure within ninety days after its delivery shall be removed from the lot.
 

THE QUARRY CONSTRUCTION AND COMMUNITY POLICIES 

  1. It is the intent of the Association to provide homeowners with a neat and orderly living environment during the time of construction and build out of the Community.
  2. The following are policies that we ask all builders, sub-contractors and homeowners to be responsible for relative to activity you may have within the Community.
  3. The speed limit within the Community is posted at 25 mph. All vehicles must abide by this posting and be especially aware of children in the area.
  4. Lot owners, builders and sub-contractors are specifically asked to park on the job site they are working on or the paved surface contiguous to their job site. No parking of vehicles or storage of any materials will be allowed on any contiguous home site to the construction site.
  5. It is your responsibility to keep construction debris to a minimum and to prevent the spread of any debris to neighboring property or public streets.
  6. Any materials cleared from a building site must be removed and hauled out of the Community.
  7. There shall not be materials of any kind whatsoever disposed of in any body of water or on any other lot within the Community.
  8. It is the responsibility of the lot owner and the contractor to keep the street and curb contiguous to your job site clean of debris, dirt and mud at all times. Any compacted construction dirt, which restricts the curb drainage flow, must be cleaned up immediately.
  9. There shall be no parking of construction vehicles in front of a completed residence within the Community.
  10. Exterior work must not begin before 7 AM. This is in keeping with the Monclova Township noise ordinance.
  11. Please make sure you have all approvals from the Architectural Committee prior to the commencement of any work. Contact them at This e-mail address is being protected from spam bots, you need JavaScript enabled to view it This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
  12. The Association establishes the above rules in an attempt to provide a First Class community and to provide an environment for our resident to have quiet and peaceful enjoyment of their homes.
 

Salisbury Quarry News



 REMINDER

 SQHA Board of Trustees Meeting

Wednesday, Sept. 1st  -  7PM

Monclova Community Center Senior Room

8115 Monclova Road Monclova OH 43542-9706

May 2010 Meeting Minutes

June 2010 Meeting Minutes

July 2010 Meeting Minutes



Neighborhood Activities/News

Quarry Neighborhood Garage Sale

Date:  Friday, & Saturday September 10th & 11th

Time: 9:00 am – 4:00 pm (No early sales please)

Participation:    Attach balloons to your mailbox each day to show that you are participating in the event.

Contact: Claudia Szczechowski at 419/381-1976 or 419/351-9377 or This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

Ads will be placed in the Toledo Blade, Maumee Mirror, and Craig’s List to advertise our sale.
 
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 
The Home Owners Association Board is considering not including the Association financial statements within the website. 
       Please let the Board know if this is a concern via the contact address provided on this website.
  


REMINDER
 
REMEMBER THAT ANY IMPROVEMENT OR ADDITION NEEDS TO BE APPROVED
BY THE BOARD BEFORE WORK BEGINS. THIS INCLUDES FENCES AND NEW HOME PLANS.

MAILBOXES

OUR ANNUAL MAILBOX CLEANUP CAMPAIGN STARTS APRIL 24TH
SHOW SOME NEIGHBORHOOD PRIDE FOR MOTHER'S DAY AND OUR ANNUAL GARAGE SALE.

FEE REMINDER

 
Please note that the Annual Quarry Homeowner Dues have been increased to $200 starting in January of 2008.

LAW ENFORCEMENT
 
Lucas County Sheriff Department Resources